Service
and Meter Installation Requirements Guide
00.00 INDEX
Section 0 - Index
0.00 Index
0.05 List of changes
Section 1 - General
1.00 Call Before You Dig
1.05 Introduction/Scope
1.10 Customer Service Phone Numbers
1.15 Definitions
1.20 General Information
1.25 Application For Service
1.30 Disconnect/Reconnect
1.35 Tampering
Section 2 - Inspections
2.05 General - Inspections
2.10 Blocked Services
2.15 Maintenance of Customer Equipment
2.20 Fire Re-Connects
Section 3 - Standard Voltages
3.05 Standard Voltages
Section 4 - Services
4.05 Point of Delivery
4.10 Service Entrance - Overhead
4.15 Underground Secondary Service From Overhead
4.20 Underground Secondary Service From Underground
4.25 Commercial/Industrial Service
4.30 Service Entrance - Multi-Family
4.35 Service to Multiple Non-Residential Buildings
4.40 Service Entrance - High-rise
4.45 Service Conductors
4.50 Three Phase Service
4.52 Primary Voltage Service
4.53 Transformer - Customer owned
4.55 Motor Restrictions
4.60 Problem Loads (Welders, Furnaces, Etc.)
4.65 Power Factor
4.70 Mobile Home and Trailer Service
4.75 Recreational Vehicle Parks
4.80 Farm Service
4.85 Flood Plain Areas
4.90 Emergency Generators
4.95 Fire Alarm and Emergency Exit
Section 5 - Meter Installations
5.05 General - Meter Installations
5.10 Meter Location
5.15 Meter Mounting Requirements
5.20 Meter Clearances
5.25 Physical Protection for Meters
5.30 Grounding
5.35 Meter Rooms
5.40 Meters - Cable TV
5.45 KWH Pulses for Customer Owned Equipment
5.50 Service Disconnect Switch
5.55 Short Circuit Current
Section 6 - Meter Socket Information
6.05 General
6.10 Self Contained Meter Sockets
6.15 Meter Pedestals
6.20 Group Metering
6.25 Transformer Rated Meter Devices
Section 7 - Instrument Transformer Enclosures
7.05 General - Instrument Transformer Enclosures
7.10 Switchgear Enclosures
Section 8 - Network Information
8.05 Service Voltages
8.10 Single Phase and Three Phase Service
8.15 Service Entrance and Service Trough
8.20 Protective Devices
8.25 Vaults and Foundations
Section 9 - Street Lighting
9.05 General - Street Lighting
9.10 Requirements (PA Only) Secondary
Section 10 - Temporary Services
10.05 General - Temporary Services
10.10 Secondary
10.15 Primary
Section 11 - Misc.
11.05 Co-Generation
11.10 Tree Clearance
Section 12 - Figures
12.02 OH Service Location
12.04 OH Service Entrance - Single Phase
12.06 OH Service Entrance - Polyphase
12.08 OH Service Drop Attachment Details
12.10 OH Service Entrance for Low Roofed Buildings
12.12 OH Service Clearances
12.14 UG Service - Single Phase
12.16 UG Service - Polyphase
12.18 UG Service From OH Secondary
12.20 UG Pole Riser Conduit
12.22 OH Service - Single Phase, Cust. Owned, 400A or less
12.24 OH Service - Single Phase, Cust. Owned, >400A
12.26 OH - Single Phase Multiple Outdoor Meter Installation
12.28 UG - Single Phase Multiple Outdoor Meter Installation
12.30 Single Phase Indoor Multiple Meter Installations
12.32 Multiple Occupancy Metering
12.34 Multiple Occupancy Metering - Building Attachment
12.36 Multiple Metering Enclosure
12.38 Primary services
12.40 UG Service - Single Phase Meter Pedestal
12.42 UG Service - Single Phase Meter Pedestal (Alternate)
12.44 Emergency Generator Connection
12.46 Emergency Service
12.48 Clearance Between Electric and Gas Supply
12.50 Mechanical Protection for Metering Equipment
12.52 OH - Pole Mounted Metering for Cable TV
12.54 UG - Pedestal Metering for Cable TV
12.56 Meter Socket - Single Phase - 120/208 Volt
12.58 Meter Socket - Single Phase Wiring
12.60 Meter Socket - Single Phase - 2 Wire 30A
12.62 Meter Socket - Polyphase - Wye
12.64 Meter Socket - Polyphase - Delta
12.66 Meter Socket - Polyphase Wiring
12.68 Group Metering
12.70 Overhead Current Transformers
12.72 Current transformer Cabinet, >400-Up To 800A
12.73 Current transformer Cabinet,
>800-Up To 2400A
12.74 Indoor Meter Board
12.76 Polyphase Meter Installation, >400-Up To 1200A
12.77 Polyphase Meter Installation,
>800-Up To 2400A
12.78 Single Phase Meter Install., >400- Up To 800A
120/208 and 120/240
12.80 Residential Development Street Lighting (PA Only)
12.82 Temporary Service From OH Facilities - Type I
12.84 Temporary Service From OH Facilities - Type II
12.86 Temporary Service From UG Facilities - Type I
12.88 Temporary Service From UG Facilities - Type II
Section 13 - Approved Meter Sockets
Single Phase
13.02 OH Single Position 100A
13.04 OH Single Position 100A w/ 100A Disconnect
13.06 OH Single Position 200A
13.08 OH Single Position 200A w/ 150A Disconnect
13.10 OH Single Position 200A w/ 200A Disconnect
13.12 OH Single Position 320A
13.14 OH/UG Multiple Position 125A
13.16 OH/UG Multiple Position 200A
13.18 OH/UG Multiple Position 125A w/Disconnect
13.20 OH/UG Multiple Position 200A w/Disconnect
13.22 UG Single Position 200A
13.24 UG Single Position 200A w/ 150A Disconnect
13.26 UG Single Position 200A w/ 200A Disconnect
13.28 UG Single Position 320A
13.30 UG Single Position and Double Position 200A Pedestal
Polyphase
13.32 OH Single Position Self Contained 125A
13.34 OH Single Position Self Contained 200A
13.36 OH/UG Single Position Self Contained 320A
13.38 UG Single Position Self Contained 200A
Current Transformer Cabinets
13.40 Current Transformer Cabinets
Gangable Metering
13.42 125A 1PH, (1PH incoming bus), 120/240 or 120/208, 2-6
position
13.44 200A 1PH, (1PH incoming bus), 120/240 or 120/208, 2-6
position
13.46 125A 1PH, (3PH incoming bus), 120/240 or 120/208, 2-6
position
13.48 200A 1PH, (3PH incoming bus), 120/240 or
120/208, 2-6 position
13.50 200A 3PH, (3PH incoming bus), 120/240 or 120/208 4
wire, 1-4 position
Meter Socket Requirements
13.60 Meter Socket Requirements
Section 14 - Inspectors List
14.05 Met-Ed Inspectors List
1 4.10
Pelelec Inspectors List
Section 15
15.05 Territory Map
Section 16
16.05 Order Form
Section 17
17.05 Alphabetical Index
End of Specification:
Created:
|
|
08/16/2000 |
Last
Revised: |
|
09/06/2000 |
Table Of Contents
Next Page
|