| 1.30 |
"(Self
contained meter socket)" was added to first sentence of fourth paragraph. |
| 4.20 |
Information on
Network service for PA was added to second page |
| 4.55 |
Motor sizes were
changed from 6.5 to 7.5 and 19.9 to 25hp (page1) |
| 8.05 |
Added sentence at
bottom of page to include other underground areas that should have services installed in
the same manner as network services. |
| 8.15 |
Information on
network service for PA was removed and added to 4.20 |
| 9.05 |
Information was
added for Penelec and JCP&L as previous info was only Met-Ed |
| 12.12 |
Min height on
drawings 2&3 was changed from 15' to 12' |
| 12.76 |
Reference under
number #1 was changed from 13.15 to 13.40 |
| As of 03/08/00
|
| 4.15 |
Changed minimum
radius on conduit from 18" to 24". |
| 4.20 |
Changed minimum
radius on conduit from 18" to 24". |
| 4.25 |
Added paragraph
at end of three phase section which covers multiple services off transformer. |
| 4.50 |
Changed
dimensions for ct's in switchgear from 30" x 30"x 12" to 36" x
30" x 20". |
| 7.10 |
Changed
dimensions for ct's in switchgear from 30" x 30"x 12" to 36" x
30" x 20". |
| 12.14 |
Changed minimum
radius on conduit from 18" to 24". |
| 12.16 |
Changed minimum
radius on conduit from 18" to 24". |
| 12.28 |
Changed minimum
radius on conduit from 18" to 24". |
| 12.40 |
Changed minimum
radius on conduit from 18" to 24". |
| 12.42 |
Changed minimum
radius on conduit from 18" to 24". |
| 13.30 |
Added Midwest to
approved list for pedestals. |
| As
of 04/21/00
|
| 1.15 |
Added definition
of select fill and select bedding |
| 5.50 |
Requirements
about disconnects ahead of metering equipment changed. |
| 12.12 |
Clearances
changed, pipemast inf removed (refer to 12.10). |
| 13.02 |
Murray and
Siemens catalog #'s changed. |
| 13.04 |
Midwest catalog
#'s added. |
| 13.06 |
Siemens catalog
#'s changed. |
| 13.10 |
Midwest catalog
#'s added. |
| 13.12 |
Thomas and
Betts/Anchor, Cutler Hammer, Durham, Milbank, Siemens and Square D catalog #'s changed. |
| 13.14 |
Siemens catalog
#'s changed |
| 13.16 |
Murray catalog
#'s added and Siemens catalog #'s changed. |
| 13.22 |
Siemens catalog
#'s changed. |
| 13.26 |
Midwest catalog
#'s added. |
| 13.28 |
Thomas and
Betts/Anchor, Cutler Hammer, Durham, Milbank, Murray, Siemens and Square D catalog #'s
changed. |
| 13.30 |
Murray and
Siemens catalog #'s changed. |
| 13.34 |
Siemens catalog
#'s changed |
| 13.36 |
Thomas and
Betts/Anchor, Cutler Hammer, Durham, Milbank, Siemens and Square D catalog #'s changed. |
| 13.38 |
Siemens and
Milbank catalog #'s changed. |
| 13.40 |
Removed Lee
Products |
| 13.42 |
Murray catalog
#'s added. |
| 13.44 |
Murray catalog
#'s added. |
| 13.60 |
Requirements for
13.12, 13.28 and 13.36 now require anti-inversion kits or clips etc. |
| 14.05 |
New requirement -
Met-Ed inspectors list |
| 14.10 |
New requirement -
Penelec inspectors list |
| 15.05 |
New requirement -
Territory map |
| 16.05 |
New requirement -
Order form |
| As of 05/31/00
|
| 00.00 |
Added 12.73 and
12.77 |
| 2.10 |
Changed time
required for previously served building inspection from 6 months to twelve months |
| 4.10 |
Added clearance
notes for swimming pools |
| 4.25 |
Changed
information on CT's |
| 5.50 |
Changed
disconnect information |
| 7.05 |
Added reference
to 12.73 & 12.77. Max CT cabinet now allowed is 2400A, larger than this requires ct's
to be mounted in switchgear |
| 12.06 |
Added fourth wire
to drawing |
| 12.10 |
Added Note 4 on
grounding |
| 12.12 |
Added clearance
notes on drawing 2 and 3 |
| 12.14 |
Added Note 4 on
grounding |
| 12.16 |
Added Note 3 on
grounding |
| 12.18 |
Changed Note 7
reference from 12.04 to 12.14 |
| 12.26 |
Added Note 4 on
grounding |
| 12.28 |
Added Note 4 on
grounding |
| 12.30 |
Added Note 6 on
grounding |
| 12.32 |
Added Note 3 on
grounding |
| 12.38 |
Changed notes on
drawing |
| 12.52 |
Added PA
requirements |
| 12.70 |
Moved Note 5 to
top phase |
| 12.73 |
New Requirement |
| 12.76 |
Changed Note 4,
added Note 11 |
| 12.77 |
New Requirement |
| 12.78 |
Changed Note 7 |
| 13.40 |
Added 1000A,
1200A, 1600A and 2400A CT cabinets |
| 13.60 |
Changed note on
13.24 and 13.26 to refer to 13.22 not 13.20 |
| As of 09/08/00
|
| 4.15 |
Added conduit
information |
| 4.20 |
Added conduit
information |
| 4.25 |
Added conduit
information, added information from Requirement 4.50 revised disconnect requirements |
| 4.50 |
Made Requirement
obsolete (see requirement 4.25) |
| 5.10 |
Changed meter
socket location information |
| 5.50 |
Added reference
to other requirements |
| 12.04 |
Changed
attachment note |
| 12.06 |
Changed
attachment note |
| 12.08 |
Changed
attachment note and diagram |
| 12.18 |
Changed notes on
conduit |
| 12.22 |
Added setting
depth info |
| 12.26 |
Changed
attachment note |
| 12.52 |
Changed
dimensions for PA and NJ |
| 13.28 |
Milbank does not accept 4",
old inventory to be used up, only accepts up to 3" conduit, use other manufacturer or
catalog # if 4" conduit is to be used |
| 13.16 |
Changed Landis
and Gyr catalog numbers |
| 13.40 |
Added Milbank catalog number |
| 13.42 |
Added GE catalog
numbers |
| 13.44 |
Added GE catalog
numbers |
| 13.46 |
Added GE catalog
numbers |
| 13.48 |
Added GE catalog
numbers |
| 13.50 |
Added GE catalog
numbers |
| 13.60 |
Added
requirements for 13.40 (800A-2400A CT cabinets) |
| 14.05 |
Inspectors List
updated |
| 14.10 |
Inspectors List
updated |
| 17.05 |
New Requirement |
| As of 04/27/01
|
| 13.40 |
Added "Meter
Devices Company, Inc." to approved list for 400-800A C.T. cabinets |
| As of 06/18/01
|
| 13.04 |
Added
Cutler-Hammer catalog number |
| 13.08 |
Added
Cutler-Hammer catalog number |
| 13.10 |
Added
Cutler-Hammer catalog number |
| 13.24 |
Added
Cutler-Hammer catalog number |
| 13.26 |
Added
Cutler-Hammer catalog number |