Service and Meter Installation Requirements Guide

00.05   LIST OF CHANGES SINCE FIRST ISSUE

As of 2/23/00

1.30 "(Self contained meter socket)" was added to first sentence of fourth paragraph.
4.20 Information on Network service for PA was added to second page
4.55 Motor sizes were changed from 6.5 to 7.5 and 19.9 to 25hp (page1)
8.05 Added sentence at bottom of page to include other underground areas that should have services installed in the same manner as network services.
8.15 Information on network service for PA was removed and added to 4.20
9.05 Information was added for Penelec and JCP&L as previous info was only Met-Ed
12.12 Min height on drawings 2&3 was changed from 15' to 12'
12.76 Reference under number #1 was changed from 13.15 to 13.40
 

As of 03/08/00
 

4.15 Changed minimum radius on conduit from 18" to 24".
4.20 Changed minimum radius on conduit from 18" to 24".
4.25 Added paragraph at end of three phase section which covers multiple services off transformer.
4.50 Changed dimensions for ct's in switchgear from 30" x 30"x 12" to 36" x 30" x 20".
7.10 Changed dimensions for ct's in switchgear from 30" x 30"x 12" to 36" x 30" x 20".
12.14 Changed minimum radius on conduit from 18" to 24".
12.16 Changed minimum radius on conduit from 18" to 24".
12.28 Changed minimum radius on conduit from 18" to 24".
12.40 Changed minimum radius on conduit from 18" to 24".
12.42 Changed minimum radius on conduit from 18" to 24".
13.30 Added Midwest to approved list for pedestals.
 

As of 04/21/00
 

1.15 Added definition of select fill and select bedding
5.50 Requirements about disconnects ahead of metering equipment changed.
12.12 Clearances changed, pipemast inf removed (refer to 12.10).
13.02 Murray and Siemens catalog #'s changed.
13.04 Midwest catalog #'s added.
13.06 Siemens catalog #'s changed.
13.10 Midwest catalog #'s added.
13.12 Thomas and Betts/Anchor, Cutler Hammer, Durham, Milbank, Siemens and Square D catalog #'s changed.
13.14 Siemens catalog #'s changed
13.16 Murray catalog #'s added and Siemens catalog #'s changed.
13.22 Siemens catalog #'s changed.
13.26 Midwest catalog #'s added.
13.28 Thomas and Betts/Anchor, Cutler Hammer, Durham, Milbank, Murray, Siemens and Square D catalog #'s changed.
13.30 Murray and Siemens catalog #'s changed.
13.34 Siemens catalog #'s changed
13.36 Thomas and Betts/Anchor, Cutler Hammer, Durham, Milbank, Siemens and Square D catalog #'s changed.
13.38 Siemens and Milbank catalog #'s changed.
13.40 Removed Lee Products
13.42 Murray catalog #'s added.
13.44 Murray catalog #'s added.
13.60 Requirements for 13.12, 13.28 and 13.36 now require anti-inversion kits or clips etc.
14.05 New requirement - Met-Ed inspectors list
14.10 New requirement - Penelec inspectors list
15.05 New requirement - Territory map
16.05 New requirement - Order form
 

As of 05/31/00
 

00.00 Added 12.73 and 12.77
2.10 Changed time required for previously served building inspection from 6 months to twelve months
4.10 Added clearance notes for swimming pools
4.25 Changed information on CT's
5.50 Changed disconnect information
7.05 Added reference to 12.73 & 12.77. Max CT cabinet now allowed is 2400A, larger than this requires ct's to be mounted in switchgear
12.06 Added fourth wire to drawing
12.10 Added Note 4 on grounding
12.12 Added clearance notes on drawing 2 and 3
12.14 Added Note 4 on grounding
12.16 Added Note 3 on grounding
12.18 Changed Note 7 reference from 12.04 to 12.14
12.26 Added Note 4 on grounding
12.28 Added Note 4 on grounding
12.30 Added Note 6 on grounding
12.32 Added Note 3 on grounding
12.38 Changed notes on drawing
12.52 Added PA requirements
12.70 Moved Note 5 to top phase
12.73 New Requirement
12.76 Changed Note 4, added Note 11
12.77 New Requirement
12.78 Changed Note 7
13.40 Added 1000A, 1200A, 1600A and 2400A CT cabinets
13.60 Changed note on 13.24 and 13.26 to refer to 13.22 not 13.20
 

As of 09/08/00
 

4.15 Added conduit information
4.20 Added conduit information
4.25 Added conduit information, added information from Requirement 4.50 revised disconnect requirements
4.50 Made Requirement obsolete (see requirement 4.25)
5.10 Changed meter socket location information
5.50 Added reference to other requirements
12.04 Changed attachment note
12.06 Changed attachment note
12.08 Changed attachment note and diagram
12.18 Changed notes on conduit
12.22 Added setting depth info
12.26 Changed attachment note
12.52 Changed dimensions for PA and NJ
13.28 Milbank does not accept 4", old inventory to be used up, only accepts up to 3" conduit, use other manufacturer or catalog # if 4" conduit is to be used
13.16 Changed Landis and Gyr catalog numbers
13.40 Added Milbank catalog number
13.42 Added GE catalog numbers
13.44 Added GE catalog numbers
13.46 Added GE catalog numbers
13.48 Added GE catalog numbers
13.50 Added GE catalog numbers
13.60 Added requirements for 13.40 (800A-2400A CT cabinets)
14.05 Inspectors List updated
14.10 Inspectors List updated
17.05 New Requirement
 

As of 04/27/01
 

13.40 Added "Meter Devices Company, Inc." to approved list for 400-800A C.T. cabinets
 

As of 06/18/01
 

13.04 Added Cutler-Hammer catalog number
13.08 Added Cutler-Hammer catalog number
13.10 Added Cutler-Hammer catalog number
13.24 Added Cutler-Hammer catalog number
13.26 Added Cutler-Hammer catalog number

 

End of Specification:

Created:

09/14/2000

Last Revised:

06/18/2001

 

Previous Page                         Next Page