Service and Meter Installation Requirements Guide

01.15   DEFINITIONS

ANSI

American National Standards Institute

Company or GPUE

GPU Energy

Customer Shall refer to the entity who is the end user of electricity, and shall also include that entity's architect, electrician, engineer and/or general contractor.
Cut-in Card Inspection agency approval.
EEI Edison Electric Institute
Finished Grade Shall refer to the eventual permanent ground level after all finished grading, paving and/or landscaping is completed.
Listed Equipment or materials included in a list published by an organization acceptable to the authority having jurisdiction and concerned with product evaluation, that maintains periodic inspection of production evaluation of listed equipment or materials, and whose listing states either that the equipment or material meets appropriate standards or has been found suitable for use in a specified manner.
NEC The latest edition of the National Electrical Code as published by the National Fire Protection Association
NEMA National Electric Manufacturers Association
NFPA National Fire Protection Association
NESC The latest edition of the National Electrical Safety Code as published by The Institute of Electrical and Electronic Engineers.
Point of Delivery That point where GPU Energy's conductors connect to the service entrance conductors/equipment of the premises supplied.

 

DEFINITIONS, CONT.

Select Bedding Select bedding is defined as sand or screening (1/4" or less stone including stone powder).
Select Fill Select fill or select backfill is defined as soil free from rocks larger than 4 inches, as well as all other debris and compacted in layers.
Service Equipment

The necessary equipment, usually consisting of a circuit breaker or switch and fuses, and their accessories, located near the point of entrance of supply conductors to a building or other structure, or an otherwise defined area, and intended to constitute the main control and means of cutoff of the supply.

Tariff

Appropriate GPU Energy Service Tariffs as filed with the Pennsylvania Public Utility Commission, or the New Jersey Board of Public Utilities.

 