| ANSI |
American
National Standards Institute |
| Company or GPUE |
GPU
Energy |
| Customer |
Shall refer to the entity who
is the end user of electricity, and shall also include that entity's architect,
electrician, engineer and/or general contractor. |
| Cut-in Card |
Inspection agency approval. |
| EEI |
Edison Electric Institute |
| Finished Grade |
Shall refer to the eventual
permanent ground level after all finished grading, paving and/or landscaping is completed. |
| Listed |
Equipment or materials
included in a list published by an organization acceptable to the authority having
jurisdiction and concerned with product evaluation, that maintains periodic inspection of
production evaluation of listed equipment or materials, and whose listing states either
that the equipment or material meets appropriate standards or has been found suitable for
use in a specified manner. |
| NEC |
The latest edition of the
National Electrical Code as published by the National Fire Protection Association |
| NEMA |
National Electric
Manufacturers Association |
| NFPA |
National Fire Protection
Association |
| NESC |
The latest edition of the
National Electrical Safety Code as published by The Institute of Electrical and Electronic
Engineers. |
|
|
| Point of Delivery |
That point where GPU Energy's
conductors connect to the service entrance conductors/equipment of the premises supplied. |
| Select Bedding |
Select bedding is defined as
sand or screening (1/4" or less stone including stone powder). |
| Select Fill |
Select fill or select backfill
is defined as soil free from rocks larger than 4 inches, as well as all other debris and
compacted in layers. |
| Service Equipment |
The
necessary equipment, usually consisting of a circuit breaker or switch and fuses, and
their accessories, located near the point of entrance of supply conductors to a building
or other structure, or an otherwise defined area, and intended to constitute the main
control and means of cutoff of the supply. |
| Tariff |
Appropriate
GPU Energy Service Tariffs as filed with the Pennsylvania Public Utility Commission, or
the New Jersey Board of Public Utilities. |