and Meter Installation Requirements Guide 02.10 INSPECTIONS FOR SERVICE TO PREVIOUSLY SERVED STRUCTURES When service is requested to an existing structure previously served by GPU Energy but not presently having a GPU Service drop and meter, or previously served and blocked for twelve (12) or more months, the Customer shall conform to all of GPU Energy's requirements and secure an electrical inspection from an electrical inspection agency acceptable to GPU Energy, before service will be rendered. All procedures and requirements necessary for a new service are applicable in the case.End of Specification:
|
|||||||||||||||