SWITCHGEAR INSTRUMENT TRANSFORMER ENCLOSURES
SWITCHGEAR ENCLOSURE FOR METERING
Prior to construction of any
switchgear enclosure for metering, the Customer shall provide for GPU Energy's Meter
Department approval, a detailed drawing showing the unit's interior, transformer
arrangement, bus arrangement and incoming line terminations. Information must be obtained
from GPU Energy Meter Department, prior to purchase, regarding the switchgear
specifications in order to provide equipment properly sized for GPU Energy's current
and/or potential transformers.
For primary service, in addition to
the above, the Customer shall also supply a detailed drawing, for GPU Energy's Customer
Service Department approval, showing the arrangement for incoming primary cable and
provisions for termination.
The Customer shall provide, install, own
and maintain all facilities beyond the point of attachment to GPU Energy's facilities, in
addition to providing and maintaining the following for metering purposes:
The metering switchgear compartment shall
be a separate compartment. Switchgear compartment for bill metering instrument
transformers shall be approved by the Area Meter Department prior to construction.
Rigid 1-1/4 inch minimum conduit, including
required bushings and fittings, between the instrument transformers and the meter mounting
device is required. The maximum conduit distance between the transform compartment and
meter socket shall not be more than fifteen (15) feet. At least four (4) feet of clearance
in front of and one (1) foot on each side of the enclosure shall be provided.
The compartment shall be grounded using #4
AWG copper, or large connected to the service equipment ground.
Switchgear compartments shall meet
requirements of ANSI C57 12.28 and are to be made of steel (minimum #11 gauge) and shall
be electroplated zinc-coated or hot dipped galvanized. Painted finishes shall be baked
enamel. The compartment must be at least 36"Wx 30"H x 20"D with a bus
separation of at least 10-1/2 inches on center, 7-1/2 inches minimum separation from the
enclosure sides and located on the supply side of any protective equipment.
Switchgear compartments shall be equipped
with a sealing hasp for GPU Energy padlock and shall be tamper resistant. Outdoor
switchgear compartments shall be weather-resisitant and the metering shall be located in a
separate compartment.
Compartments shall provide adequate means
to mound and secure instrument transformers. When bussed switchgear is used, a small
removable section of bus-bar shall be provided to facilitate transformer installation.
Enclosures shall be designed to provide
suitable from access for maintenance and testing.
Compartments shall not be used as junction
boxes.
GPU Energy will provide and the Customer
shall install the metering instrument transformers (in some areas of GPU Energy, the
Company will install the CT's).
The Customer shall make all primary
termination on the instrument transformers unless otherwise specified by GPU Energy. GPU
Energy will make all secondary termination on the instrument transformers.