Service
and Meter Installation Requirements Guide
08.05
UNDERGROUND NETWORK SYSTEM AREAS
SERVICE VOLTAGE
The standard service supplied by the
Company is alternating current with a nominal frequency of 60 hertz. Not all types of
service listed below are available at all locations, and service voltages other than
secondary may be specified by the Company under special conditions such as may relate to
the location, size, or type of load.
SECONDARY DISTRIBUTION VOLTAGE IN THE
ESTABLISHED UNDERGROUND NETWORK SYSTEMS AREAS IN THE CITIES OF ALTOONA, ASBURY PARK,
EASTON, ERIE, JOHNSTOWN, LEBANON, MORRISTOWN, READING AND YORK
Wiring
type and location |
Voltage |
Single-Phase, 3-wire, wye
(from network system) |
120/208 |
Three-Phase, 4-wire, wye for
loads of 300 KVA or less
(from network system) |
120/208 |
Three Phase, 4-wire, wye for
loads from 300 KVA to 750 KVA
(at the Company's determination from the network or separate transformer) |
120/208 |
| Three Phase, 4 wire, wye for
loads from 750 KVA to 1500 KVA from separate transformer. (750 KVA to 1000 KVA for Asbury
Park, Altoona 2400/4160, Easton network area). |
277/480 |
PRIMARY DISTRIBUTION VOLTAGES IN THE ESTABLISHED UNDERGROUND NETWORK
SYSTEM AREAS IN THE CITIES OF: ALTOONA, ASBURY PARK, EASTON, ERIE, JOHNSTOWN, LEBANON,
MORRISTOWN, READING AND YORK
Wiring
type and location |
Voltage |
| Three Phase, 4 wire,
wye(Altoona, Asbury Park) |
2400/4160 |
| Three Phase, 3 wire, delta (
Easton) |
4,800 |
| Three Phase, 3 wire, delta
(Erie) |
12100 |
| Three Phase, 4 wire, wye
(Altoona, Morristown) |
7200/12,470 |
| Three Phase, 4 wire, wye (
Lebanon, Reading and York) |
7,620/13,200
|
| Three Phase, 4 wire, wye
(Johnstown) |
13200/22,860 |
There are other underground areas in the Company such as Summit, Pompton,
Allenhurst, Redbank, etc. that shall have services installed in the same manner as network
systems areas.
End of Specification: